Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Peningkatan produktivitas mesin EFC-201 di PT Spindo Surabaya
Author
Cahyadi, Teddy
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01041102/IND/2006
Subject(s)
MOTION STUDY
Notes
Appendix: p. 28 - 39
Bibliography: p. 27
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 39 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
06238/06
(T) - 658.542 Cah P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Penentuan jumlah tenaga kerja bagian pengepakan kabinet PT X
Perbaikan durasi dan pemenuhan task list aktivitas weekly cleaning pada mesin maker di PT X
Analisis available time pada mesin A di PT. XYZ
Optimalisasi kapasitas untuk memenuhi perencanaan produksi di PT X
Perbaikan metode kerja pada bagian pengemasan di PT. Kembang Bulan
Upaya pengalokasian operator in-line QC di PT Smart Tbk.
Penetapan waktu kerja standard proses pembuatan strain clamp di PT Bina Karya Baru
Pengalokasian operator pada lantai produksi PT X