Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Pengalokasian operator pada lantai produksi PT X
Author
Sinatra, Andri
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2011
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021547/IND/2011
Subject(s)
MOTION STUDY
TIME STUDY
WORK MEASUREMENT
Notes
Appendix: p. 48 - 69
Bibliography: p. 47
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 69 p.
Dimension
30 cm.
Other Desc.
-
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01313/12
(T) 658.542 Sin P
-
Unavailable : Removed
Similar Collection
by author or subject
LKP : penjadwalan kerja di PT Surya Tedjakusuma
Perancangan metode kerja pada proses penyortiran udang di PT. XYZ
Perancangan alat ukur penilaian kinerja biro kepegawaian sebuah universitas dengan pendekatan balanced scorecard dan baldrige scoring
Distribusi chemical di finishing line PT. XYZ
LKP : NV The Kenarie Soy Manufactory
Analisa perbaikan sistem produksi dari shift 1 di PT Multicone Paperindo
Motion and time study
Analisa kecukupan jumlah transporter dan rancangan jadwal shift kerja operator di PT Philips Indonesia