Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Pengalokasian operator pada lantai produksi PT X
Author
Sinatra, Andri
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2011
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021547/IND/2011
Subject(s)
MOTION STUDY
TIME STUDY
WORK MEASUREMENT
Notes
Appendix: p. 48 - 69
Bibliography: p. 47
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 69 p.
Dimension
30 cm.
Other Desc.
-
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01313/12
(T) 658.542 Sin P
-
Unavailable : Removed
Similar Collection
by author or subject
Penerapan value stream mapping dalam upaya mengurangi waste guna menurunkan lead time proses penerimaan barang jadi di PT X
Evaluasi target pada bagian presshop line tube spot di PT. Inti Pelangi Drumasindo
Perancangan fasilitas kerja pada departemen pengecatan dengan menggunakan pendekatan ergonomi guna meningkatkan produktivitas kerja di Perusahaan Eternit Hero Malang
Penyusunan balance scorecard pada 'PT Tirta Maju Bahagia'
Studi tentang pengamatan standar waktu dan produktivitas pekerjaan konstruksi
Peningkatan produktivitas dengan penetapan waktu kerja standar proses pembuatan sepeda
Identifikasi kebutuhan perkembangan dunia industri terhadap program S2 teknik industri
Pengurangan waktu proses intra transportasi menggunakan value stream mapping