Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Pengalokasian operator pada lantai produksi PT X
Author
Sinatra, Andri
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2011
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021547/IND/2011
Subject(s)
MOTION STUDY
TIME STUDY
WORK MEASUREMENT
Notes
Appendix: p. 48 - 69
Bibliography: p. 47
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 69 p.
Dimension
30 cm.
Other Desc.
-
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01313/12
(T) 658.542 Sin P
-
Unavailable : Removed
Similar Collection
by author or subject
Optimalisasi jumlah kebutuhan tenaga kerja dengan menggunakan metode line balancing di PT X
Teknik penghitungan volume kerja
Perencanaan produksi dengan sistem terintegrasi menggunakan program fleksibel di PT. Surabaya Wire
Pengukuran waktu istirahat untuk pengguna komputer
Perancangan pengukuran kinerja staf dengan metode MBNQA modifikasi di perusahaan x
Analisa hubungan antara size, product life cycle, dan market position dengan penggunaan balanced scorecard pada sektor industri restoran
Perencanaan kebutuhan bahan baku pada PT "X" di Surabaya