Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Pengukuran kinerja di PT. Lotus Indah Textile Industries dengan menggunakan metode integrated performance measurement systems
Author
Suryajaya, William
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2005
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01021014/IND/2005
Subject(s)
WORK MEASUREMENT
TIME STUDY
PRODUCTION CONTROL
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 158 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01642/06
(T) - 658.54 Sur P
-
Unavailable : Removed
Similar Collection
by author or subject
Analisis produktivitas staf administrasi bagian bahan baku PT Bumi Rotan Jaya
Penentuan waktu baku dan analisa perhitungan kebutuhan tenaga kerja seksi stock preparation 5 & 7 PT. Suparma Tbk
Perbaikan durasi dan pemenuhan task list aktivitas weekly cleaning pada mesin maker di PT X
Perancangan fasilitas kerja pada departemen pengecatan dengan menggunakan pendekatan ergonomi guna meningkatkan produktivitas kerja di Perusahaan Eternit Hero Malang
Implementasi KPI dan perancangan sistem e-KPI pada PT. XYZ
Evaluasi re-layout divisi kabel dan penerapan kaizen divisi filter di PT FSCM Manufacturing Indonesia
Perancangan sistem PPIC di UD Manda Sari
Studi eksperimental: mengurangi bias pengukuran umum balanced scorecard dalam penilaian kinerja pada mahasiswa S1 angkatan 2010 dan 2012