Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Usulan upaya pengurangan downtime mesin potong single deck di PT. 'X'
Author
Ferandino, Jimmy
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2010
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021457/IND/2010
Subject(s)
PRODUCTION MANAGEMENT
EFFICIENCY, INDUSTRIAL
PRODUCTION CONTROL
Notes
Appendix : p. 63 - 88
Bibliography : p. 62
Abstract
-
Physical Dimension
Number of Page(s)
xv, 88 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03849/10
(T) 658.56 Fer U
-
Unavailable : Removed
Similar Collection
by author or subject
Perancangan peningkatan kapasitas produksi mesin husker di PT Agrindo
Perancangan sistem just in time untuk menurunkan lead time pada area 7 dan 8 di PT X
Operations management
Pengukuran parameter mesin endfacing 1 dan 2 dan pengaruh crane terhadap hasil produksi
LKP: PT Cipta Indah jl. Rungkut Industri III/61 Surabaya
Advances in manufacturing
Perancangan desain PEFF dashboard untuk akurasi data actual working hour pada PT Toyota Motor Manufacturing Indonesia
Peningkatan produktivitas produk D16D di assembly line A PT Astra Otoparts divisi Adiwira Plastik