Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : penghitungan waktu baku dan efisiensi operator di PT Wonojati Wijoyo
Author
Setiawati, Anita
Additional Author(s)
Mregawati
Megawati
Publisher
Surabaya: 1998
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek produksi I
Subject(s)
MANUFACTURING PROCESSES
TIME STUDY
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
ix, 88 p.
Dimension
29 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
06416/98
L 670.42 Set L-I
Library - 6th Floor
Available
Similar Collection
by author or subject
Upaya pengalokasian operator in-line QC di PT Smart Tbk.
Peningkatan produktivitas mesin R7 dengan mengurangi down time di PT Spindo
Applied manufacturing process planning
Teknologi mekanik
Evaluasi target pada bagian presshop line tube spot di PT. Inti Pelangi Drumasindo
Fundamentals of modern manufacturing
LKP : PT Boma-Bisma-Indra (Persero) divisi mesin peralatan pabrik Pasuruan
How to implement lean manufacturing