Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisis available time pada mesin A di PT. XYZ
Author
Santosa, Ivan
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2017
Language
Indonesian
ISBN
-
Series
Skripsi No. 03022052/IND/2017
Subject(s)
MOTION STUDY
TIME STUDY
STANDARD OPERATING PROCEDURE
Notes
Appendix: p. 81-101
. Bibliography: p.80.
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 101 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02816/17
(T) IND 2052
Library - 8th Floor
Available
Similar Collection
by author or subject
Studi tentang pengamatan standar waktu dan produktivitas pekerjaan konstruksi
Penurunan waktu weekly cleaning glue pot dan drum serta penetapan jumlah operator pada proses pembungkusan karton
Upaya peningkatan output produksi PT. Spindo di gudang VII unit I
Sukses anda terletak pada putaran waktu
Penentuan waktu baku dan analisa perhitungan kebutuhan tenaga kerja seksi paper machine 1, 2 dan 3 PT. Suparma Tbk Surabaya
Penjadwalan jobshop di CV Sinar Indah Teknik
Niebel's methods, standards, and work design
Penentuan jumlah tenaga kerja bagian pengepakan kabinet PT X