Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Estimasi penghematan biaya dan perancangan standarisasi kerja pada produksi air cleaner di PT. Astra Otoparts divisi adiwira plastik
Author
Saryadi, Richard Dwinata
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2015
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021792/IND/2015
Subject(s)
COSTS, INDUSTRIAL
PRODUCTION MANAGEMENT
Notes
Appendix: p. 82-115
. Bibliography: p. 81.
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 115 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02648/15
(T) IND 1792
-
Unavailable : Removed
Similar Collection
by author or subject
Principles of operations management
LKP : PT Hapete Jalan Margomulyo Indah Surabaya-Jawa Timur
Studi deskriptif inovasi proses pada UD. Gampang Ingat
LKP : PT Sentrabumi Palapa Utama Surabaya
LKP : PT Bobo Embroidery Surabaya
Integrative manufacturing
Optimalisasi tenaga kerja pada lini produksi thimonier dan emec-tak 6 di PT Smart Tbk.
Studi kelayakan perluasan perusahaan sepatu dan topi CV. XYZ