Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Evaluasi produktivitas kerja struktur kolom, balok dan plat di proyek Tunjungan Plaza 6
Author
Benaya A.S.T.
Additional Author(s)
Saputra, Andrew Darma
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2016
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012077/SIP/2015
Subject(s)
BUILDINGS, REINFORCED CONCRETE
TALL BUILDING-DESIGN AND CONSTRUCTION
CONSTRUCTION INDUSTRY-MANAGEMENT
COLUMNS
Notes
Appendix: p. 46-159
. Bibliography: p. 45.
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 159 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00525/16
(T) SIP 2077
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Program komputer untuk penempatan menara angkat tunggal
Strategi perusahaan konstruksi di Surabaya di era krisis
Pengukuran efektifitas dan frekuensi faktor yang mempengaruhi produktivitas pekerja pada pekerjaan finishing proyek rumah tinggal di Surabaya
Monitoring dan analisis jadwal proyek menggunakan metode performance intensity dan CPM pada proyek hotel
Faktor-faktor yang mempengaruhi pelaksanaan pembayaran dalam proyek konstruksi
Approximate cost estimate berdasarkan kandungan besi dan kebutuhan bekisting pada struktur beton bertulang bangunan tinggi
Identifikasi dan alokasi risiko-risiko pada proyek jembatan nasional Suramadu
Studi perbandingan sistem dan prosedur di dalam manajemen material dengan manajemen bahan bangunan pada proyek konstruksi "X"