Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Proporsi biaya tiap satuan pekerjaan struktur beton bertulang proyek konstruksi bangunan tinggi
Author
Jeremy, A.T.
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2016
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012074/SIP/2015
Subject(s)
BUILDINGS-ESTIMATES
REINFORCED CONCRETE CONSTRUCTION
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
. Bibliography: p. 131.
Abstract
-
Physical Dimension
Number of Page(s)
xix, 131 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00534/16
(T) SIP 2074
Library - 8th Floor
Available
Similar Collection
by author or subject
Studi tentang produktivitas kelompok pekerja pada pekerjaan pasangan bata di proyek perumahan
Permasalahan yang terjadi pada gambar perencanaan dan spesifikasi teknis pada proses konstruksi
A survey of progress characteristics of construction projects in Thailand and Indonesia
Pengaruh dari faktor-faktor yang berperan dalam pemilihan project delivery system di Surabaya
Program T-C aktivitas proyek berdasarkan produktivitas pekerja di lapangan
Risiko dan penanganannya pada proyek konstruksi: studi kasus pada proyek gedung dan infrastruktur
Total construction project management
Case study of cost estimation procedure and development methods in RHDHV Indonesia