Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Proporsi biaya tiap satuan pekerjaan struktur beton bertulang proyek konstruksi bangunan tinggi
Author
Jeremy, A.T.
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2016
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012074/SIP/2015
Subject(s)
BUILDINGS-ESTIMATES
REINFORCED CONCRETE CONSTRUCTION
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
. Bibliography: p. 131.
Abstract
-
Physical Dimension
Number of Page(s)
xix, 131 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00534/16
(T) SIP 2074
Library - 8th Floor
Available
Similar Collection
by author or subject
Analisis perlakuan akuntansi pada perusahaan jasa konstruksi
Studi perbandingan sistem dan prosedur di dalam manajemen material dengan manajemen bahan bangunan pada proyek konstruksi "X"
Evaluasi kapasitas bangunan beton bertulang
Case study of cost estimation procedure and development methods in RHDHV Indonesia
Perbandingan beton precast dengan cast in situ ditinjau dari segi biaya, waktu, dan sambungan
Analisa faktor-faktor penyebab rework dan tingkat kesulitan pencegahannya pada pekerjaan struktur, finishing, dan mep
Permodelan geser dinding geser beton untuk analisis non-linier
Monitoring jadwal suatu proyek sekolah dengan menggunakan metode SPI dan PPC