Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Proporsi biaya tiap satuan pekerjaan struktur beton bertulang proyek konstruksi bangunan tinggi
Author
Jeremy, A.T.
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2016
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012074/SIP/2015
Subject(s)
BUILDINGS-ESTIMATES
REINFORCED CONCRETE CONSTRUCTION
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
. Bibliography: p. 131.
Abstract
-
Physical Dimension
Number of Page(s)
xix, 131 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00534/16
(T) SIP 2074
Library - 8th Floor
Available
Similar Collection
by author or subject
Faktor resiko yang kritis pada proyek water supply dan power plant dengan pola bot di Indonesia
Studi tentang komponen-komponen yang terdapat dalam tahapan-tahapan pengembangan perumahan oleh PT."X" di makassar
Computer-based construction project management
Analisa dampak kenaikan harga BBM terhadap biaya konstruksi
Permasalahan yang terjadi pada gambar perencanaan dan spesifikasi teknis pada proses konstruksi
Infrastructure for the built environment
Program p3-tc untuk perhitungan waktu efektif penggunaan tower crane pada konstruksi bangunan bertingkat
Strategi sumber daya manusia untuk pekerja konstruksi (staf teknik)