Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Proporsi biaya tiap satuan pekerjaan struktur beton bertulang proyek konstruksi bangunan tinggi
Author
Jeremy, A.T.
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2016
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012074/SIP/2015
Subject(s)
BUILDINGS-ESTIMATES
REINFORCED CONCRETE CONSTRUCTION
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
. Bibliography: p. 131.
Abstract
-
Physical Dimension
Number of Page(s)
xix, 131 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00534/16
(T) SIP 2074
Library - 8th Floor
Available
Similar Collection
by author or subject
Pembuatan model assessment untuk identifikasi delapan pemborosan di bidang industri konstruksi
Reinforced concrete fundamentals
Studi litelatur tentang perkembangan critical chain method
Penerapan approximate cost estimate pada struktur beton bertulang bangunan ruko (SOHO)
Aplikasi dan pengembangan sistem pengendalian biaya proyek untuk kontraktor (studi kasus pada suatu proyek rumah tinggal di Surabaya)
Studi penerapan keselamatan dan kesehatan kerja (K-3) dalam penggunaan tower crane pada proyek konstruksi
Model pengendalian biaya dan resiko (pada perumahan graha famili, Surabaya)
Evaluasi produktivitas kerja struktur kolom, balok dan plat di proyek Tunjungan Plaza 6