Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Proporsi biaya tiap satuan pekerjaan struktur beton bertulang proyek konstruksi bangunan tinggi
Author
Jeremy, A.T.
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2016
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012074/SIP/2015
Subject(s)
BUILDINGS-ESTIMATES
REINFORCED CONCRETE CONSTRUCTION
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
. Bibliography: p. 131.
Abstract
-
Physical Dimension
Number of Page(s)
xix, 131 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00534/16
(T) SIP 2074
Library - 8th Floor
Available
Similar Collection
by author or subject
Faktor-faktor yang mempengaruhi pelaksanaan pembayaran dalam proyek konstruksi
Faktor-faktor penghambat kontraktror untuk melaksanakan k3 pada proyek konstruksi
Perbandingan produktivitas tenaga kerja untuk beberapa jenis pekerjaan pada bangunan perumahan
Studi kasus perbandingan berbagai bata ringan dari segi material, biaya, dan produktivitas
Construction project administration
Studi kasus pembuatan shop drawing pada proyek grande water place residences phase 1 Surabaya
Studi joint risk management pada proyek konstruksi di Surabaya
Analisa studi perbandingan antara rumah toko dengan kombinasi rumah toko-stand ditinjau dari aspek pemasaran dan finansial pada proyek gateway, Sidoarjo