Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Implementasi KPI dan perancangan sistem e-KPI pada PT. XYZ
Author
Darmadji, Kevin Chevalia
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2016
Language
Indonesian
ISBN
-
Series
Skripsi No. 03021992/IND/2016
Subject(s)
BALANCED SCORECARD
WORK MEASUREMENT
KEY PERFORMANCE INDICATORS (KPI)
Notes
Appendix: p. 47-48
. Bibliography: p. 46 .
Abstract
-
Physical Dimension
Number of Page(s)
xii, 48 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02549/16
(T) IND 1992
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Perancangan alat bantu dan usulan perbaikan sistem kerja departemen extruder di PT. Kertarajasa Raya Sidoarjo
Perancangan perubahan metode pergantian dies pada departemen kawat di PT Surabaya Wire
LKP : PT Tri Anugerah Metalindo
Perancangan keseimbangan lintasan perakitan dengan algoritma genetika di PT Wijaya Indonesia Makmur Bicycle Industries Surabaya
Upaya peningkatan kenyamanan kerja melalui pendekatan ergonomis perusahaan 'X' Surabaya
Pengukuran dan analisa kinerja PT "X" dengan metode balanced scorecard
Perancangan penjadualan pada departemen produksi di CV. Kayu Murni
Penentuan waktu baku dan analisa perhitungan kebutuhan tenaga kerja stock preparation #1, #2, #3, dan #6 departemen stock preparation PT Suparma Tbk.