Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Implementasi KPI dan perancangan sistem e-KPI pada PT. XYZ
Author
Darmadji, Kevin Chevalia
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2016
Language
Indonesian
ISBN
-
Series
Skripsi No. 03021992/IND/2016
Subject(s)
BALANCED SCORECARD
WORK MEASUREMENT
KEY PERFORMANCE INDICATORS (KPI)
Notes
Appendix: p. 47-48
. Bibliography: p. 46 .
Abstract
-
Physical Dimension
Number of Page(s)
xii, 48 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02549/16
(T) IND 1992
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Perancangan alat bantu dan usulan perbaikan sistem kerja departemen extruder di PT. Kertarajasa Raya Sidoarjo
Perancangan pengukuran kinerja dengan pendekatan Malcolm Baldrige National Quality Award (MBNQA) modifikasi di PT Lestari Karya Makmur Surabaya
Studi eksperimental: mengurangi bias pengukuran umum balanced scorecard dalam penilaian kinerja pada mahasiswa S1 program akuntansi pajak
Perencanaan kebutuhan bahan baku dan penjadwalan produksi
Penentuan waktu baku dan analisa perhitungan kebutuhan tenaga kerja bagian paper machine PT. Suparma Tbk Surabaya
LKP : PT Wangsa Manunggal Jaya perkasa
Evaluasi target pada bagian presshop line tube spot di PT. Inti Pelangi Drumasindo
Perencanaan kebutuhan kapasitas produksi di PT Bahari Mitra Surya