Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Produktivitas tenaga kerja sebelum dan sesudah perubahan volume pada kontrak untuk proyek pembangunan apartemen X dan hotel Y di Surabaya
Author
Christy W., Albert Valentinus
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Magister Teknik Sipil Universitas Kristen Petra, 2016
Language
Indonesian
ISBN
-
Series
Tesis No. 01000227/MTS/2016
Subject(s)
CONSTRUCTION INDUSTRY-LABOR PRODUCTIVITY
CONSTRUCTION INDUSTRY-MANAGEMENT
CONSTRUCTION INDUSTRY-PERSONNEL MANAGEMENT
WORK MEASUREMENT
Notes
Appendix: p. 146-168
. Bibliography: p. 143-145 .
Abstract
-
Physical Dimension
Number of Page(s)
xviii, 168 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00599/17
(T2) MTS 0227
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Perkembangan real estat citraraya di surabaya
Kajian awal mengenai peformance intensity (momentum management) untuk mengukur kinerja waktu proyek konstruksi
Analisa biaya dan pengukuran kerja pada produk amplop dan box file di PT. X
Penyiapan bar bending schedule untuk proyek konstruksi
Perbandingan biaya total, material, dan upah konstruksi rumah sejahtera murah antar daerah di Indonesia tahun 2015
Studi kasus penerapan metode collapsed as-built terhadap sebuah bangunan perkuliahan di kota Surabaya
Perbaikan kinerja proses produksi cetakan tiang pancang di CV Delta Mas
Penerapan quality function deployment dalam bidang konstruksi