Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Optimasi construction site layout menggunakan metode metahueristic algorithm pada proyek great hotel Diponegoro
Author
Jonathan, Vincent
Additional Author(s)
Sugiarto, Adrian Kristian
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2017
Language
Indonesian
ISBN
-
Series
Skripsi No. 2101287/SIP/2017
Subject(s)
COMPUTER ALGORITHMS
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix: p. 47-83
. Bibliography: p. 44-46 .
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 83 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02683/17
(T) SIP 2187
Library - 8th Floor
Available
Similar Collection
by author or subject
Approximate cost estimate berdasarkan kandungan besi dan kebutuhan bekisting pada struktur beton bertulang bangunan ruko (SOHO)
Penerapan value engineering pada proyek konstruksi
Construction management
Analisis jadwal pelaksanaan pekerjaan struktur proyek 6 lantai dengan menggunakan program microsoft project 2003
Model simulasi um-cyclone pada operasional perusahaan beton siap pakai (studi kasus PT. Jatim Readymix)
Studi kasus penerapan rekayasa nilai pada suatu proyek rumah tinggal
Manajemen risiko pada kecelakaan kerja di proyek konstruksi
Perbandingan aplikasi progam Microsoft Project dan Primavera dalam penjadwalan proyek konstruksi