Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Case study of cost estimation procedure and development methods in RHDHV Indonesia
Author
Angkawijaya, Melissa
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2013
Language
English
ISBN
-
Series
Skripsi No. 21011922/SIP/2013
Subject(s)
BUILDINGS-ESTIMATES
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix: p. 52 - 141
. Bibliography: p. 51.
Abstract
-
Physical Dimension
Number of Page(s)
xii, 141 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02605/13
(T) SIP 1922
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Analisa faktor kepuasan penghuni apartemen menengah bawah di Surabaya
Analisis daya tarik industri pada perusahaan real estat di Surabaya dan sekitarnya
Studi tentang analisa pembengkakan biaya dan waktu pada proyek konstruksi real estate
Penelitian tentang pelaksanaan program K3, perkembangan dan hasilnya pada pekerjaan konstruksi beton di Surabaya
Survei tingkat kepuasan penyewa terhadap fasilitas yang disediakan pengelola di gedung perkantoran "X" Surabaya
Evaluasi sistem manajemen k3 terhadap metode pemancangan jack-in pile
Studi tentang faktor-faktor yang menentukan besarnya mark up dalam penerapan teori utilitias pada penawaran konstruksi fisik di Surabaya
Faktor-faktor kesuksesan proyek berdasarkan pendapat manajer proyek