Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perbandingan tingkat kepentingan dan kepuasan antara insentif finansial dan insentif non-finansial bagi staf karyawan lapangan dan kantor
Author
Purnomo, Evan Agung
Additional Author(s)
Anugrah P. G., Stefanus
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2017
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012175/SIP/2017
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
CONSTRUCTION INDUSTRY-PERSONNEL MANAGEMENT
INCENTIVE
Notes
Appendix: p. 68-85
. Bibliography: p. 65-67.
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 85 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02694/17
(T) SIP 2175
Library - 8th Floor
Available
Similar Collection
by author or subject
Perkembangan sustainable construction di Indonesia dan potensi penerapannya pada tahap pelaksanaan
Project evaluation and procurement case studies
Potensi penerapan lean construction tools pada proyek konstruksi di Surabaya
Analisis produktivitas jam normal dan jam lembur pada pekerjaan struktur beton bertulang
Construction scheduling
Model pengaruh iklim keselamatan terhadap perilaku keselamatan dengan determinan pengetahuan dan motivasi pada proyek konstruksi
Perencanaan dan penjadwalan sumber daya manusia pada proyek konstruksi dengan program primavera
Strategi sumber daya manusia untuk pekerja konstruksi (staf teknik)