Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisis faktor penyebab keterlambatan pada bangunan tinggi di Surabaya
Author
Ladjao, Jordy
Additional Author(s)
Yurianto, Edwin
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2015
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012056/SIP/2015
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
TALL BUILDINGS
CONSTRUCTION PROJECTS-MANAGEMENT
Notes
Appendix: p. 98-126
. Bibliography: p. 95-97.
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 126 p.
Dimension
30 cm.Appendix: p. 98-126
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00531/16
(T) SIP 2056
-
Unavailable : Removed
Similar Collection
by author or subject
Project management in construction
Studi kasus mengenai sisa material baja tulangan pada proyek ruko
Pengaturan risiko hujan dalam kontrak serta dampak dan kendalanya pada proyek konstruksi
Studi kasus harga satuan upah dan bahan beton bertulang untuk proyek bangunan satu lantai
Perhitungan percent plan completed dan identifikasi faktor tidak tercapainya rencana pekerjaan pada.
Produktivitas pengecoran beton ready-mixed dengan concrete pump dan tower crane (Studi Kasus: Proyek Ciputra World Surabaya)
Construction contracting
Peranan teknologi robotik di proyek konstruksi