Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Prefabrication dan modular construction serta pengaruh precast terhadap scheduling proyek Jemmy Vernatha, Shamgar Eldad
Author
Vernatha, Jemmy
Additional Author(s)
Eldad, Shamgar
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2017
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012173/SIP/2017
Subject(s)
PROJECT MANAGEMENT
SCHEDULLING (MANAGEMENT)
Notes
Appendix: p. 49-53
. Bibliography: p. 47-48.
Abstract
-
Physical Dimension
Number of Page(s)
xii, 53 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02791/17
(T) SIP 2173
-
Unavailable : Removed
Similar Collection
by author or subject
Perencanaan dan pengendalian proyek PT. Triple's dalam pembangunan gedung kantor unit pelayanan PT PLN di Jatirogo
Managing projects large and small
Upaya penerapan source validation protocol dari forensic schedule analysis pada salah satu proyek gedung bertingkat di Surabaya
Engineering construction risks
Potensi penerapan pmbok untuk kepentingan manajemen konstruksi di Surabaya
Project management in construction
Project management
Studi tentang faktor-faktor yang mempengaruhi besarnya mark-up pada kontraktor ruko dan perumahan di Surabaya