Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi tentang faktor-faktor yang mempengaruhi besarnya mark-up pada kontraktor ruko dan perumahan di Surabaya
Author
Sucahyo, Joyce Eunike Oktavia
Additional Author(s)
Soesilo, Yohanes Kurniawan
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.20401400/SIP/2004
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xix, 104 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00332/05
(T) - 690.068 Suc S
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Planning, performing, and controlling projects
Faktor sukses kemitraan antara kontraktor dan subkontraktor pada proyek mall di Surabaya
Kajian metode takt time pada proyek konstruksi
Perbandingan komposisi pekerja pasangan dinding bata antara SNI 2008 dengan kenyataan di lapangan...
Faktor-faktor dalam service quality pada perusahaan konsultan perencana di Surabaya
Pengaruh sistem manajemen k3 terhadap waktu dan biaya proyek
Modifikasi teknik discrete shear GAP pada elemen balok timoshenko berbasis kriging dan pembentukan elemen makro segitiga pelat reissner-mindlin
Identifikasi faktor-faktor penentu dalam pengadaan dan pemilihan Ruko di Surabaya