Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penerapan metode time impact analysis pada sebuah proyek bangunan gedung bertingkat di Surabaya
Author
Tjanlisan, Yonri
Additional Author(s)
Cuntoro, Rivan
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2018
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012229/SIP/2018
Subject(s)
CONTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
Appendix: p. 52-53
. Bibliography: p. 51 .
Abstract
-
Physical Dimension
Number of Page(s)
xviii, 53 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01781/18
(T) SIP 2229
Library - 8th Floor
Available
Similar Collection
by author or subject
Potensi penerapan pmbok untuk kepentingan manajemen konstruksi di Surabaya
Planning, performing, and controlling projects
Pembuatan software sebagai aplikasi linear scheduling method pada perencanaan penjadwalan proyek jalan
Penyiapan harga satuan pekerjaan untuk bill of quantity pekerjaan konstruksi
Sistem pengambilan keputusan bagi Kontraktor untuk mengikuti tender
Managing projects
Pengembangan water world di Surabaya
Analisis frekuensi, dampak, dan jenis keterlambatan pada proyek konstruksi