Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Optimasi multi-objektif permasalahan time-cost-quality trade-off pada proyek soho X dengan menggunakan metode metaheuristik
Author
Ho, Michael
Additional Author(s)
Gozal, Renaldy
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2018
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012239/SIP/2018
Subject(s)
BUILDINGS--ESTIMATES
PROJECT MANAGEMENT
Notes
Appendix: p. 46-97
. Bibliography: p. 44-45.
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 97 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02943/18
(T) SIP 2239
Library - 8th Floor
Available
Similar Collection
by author or subject
IT project management
Analisis frekuensi, dampak, dan jenis keterlambatan pada proyek konstruksi
Project planning, scheduling, and control
Construction extension to the PMBOK guide third edition
A guide to the project management body of knowledge
Potret penerapan perencanaan dan pengendalian jadwal proyek pada suatu kontraktor BUMN
Design management
Hubungan antara motivasi dan kinerja para mandor dalam pekerjaan konstruksi di surabaya