Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa produktivitas pekerja dengan metode work sampling: Studi kasus pada proyek X
Author
Yuanto, Kwan Septian
Additional Author(s)
Christavian, Hans
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2018
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012263/SIP/2018
Subject(s)
LABOR PRODUCTIVITY
WORK SAMPLING
Notes
Appendix: p. 55-146
. Bibliography: p. 54.
Abstract
-
Physical Dimension
Number of Page(s)
xv, 146 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02964/18
(T) SIP 2263
Library - 8th Floor
Available
Similar Collection
by author or subject
Studi kasus pengukuran pengaruh faktor-faktor terhadap produktivitas pekerja pada proyek konstruksi
Pengukuran kinerja perusahaan dengan metode balanced scorecard di pt. x
Pengaruh kepemimpinan transformasional terhadap kinerja karyawan pada CV. Norton Surabaya
Pengaruh value added intellectual capital terhadap produktivitas karyawan dan return on asset pada perusahaan jasa yang terdaftar di BEI
Upaya peningkatan kinerja UPPK Petra menggunakan referensi balanced score
Upaya pencapaian target output mesin injeksi 7 dan penempatan material finishing pada storage area di PT. X
Studi kasus pengukuran produktivitas dan pengaruh faktor-faktor pada pekerjaan plafon
Penentuan waktu baku dan analisa perhitungan kebutuhan tenaga kerja stock preparation #1, #2, #3, dan #6 departemen stock preparation PT Suparma Tbk.