Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisis nilai produktivitas dan labor utilization rate tenaga kerja dengan metode work sampling : studi kasus proyek Tunjungan Plaza 6
Author
Prasetyo, Derian Asher
Additional Author(s)
Anthony
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2016
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012145/SIP/2016
Subject(s)
LABOR PRODUCTIVITY
CONSTRUCTION INDUSTRY-MANAGEMENT
WORK SAMPLING
Notes
Appendix: p. 52-121
. Bibliography: p. 51.
Abstract
-
Physical Dimension
Number of Page(s)
xviii, 121 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01004/17
(T) SIP 2145
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Karier wanita dan faktor-faktor yang berpengaruh dalam proyek konstruksi
Pengaruh budaya keselamatan kerja pada perilaku pekerja terhadap keselamatan kerja
Studi tentang constructability concept berdasarkan sasaran proyek
Analisa pengaruh budaya dan sosial terhadap niat konsumen dalam pembelian rumah pada perumahan mewah di Makassar
Studi kasus penerapan schedule assessment pada penjadwalan proyek salah satu gedung bertingkat di Surabaya
Analisis faktor penyebab keterlambatan pada bangunan tinggi di Surabaya
Analisis diskriminan dan aplikasi analytical hierarchy process untuk menghitung faktor-faktor yang mempengaruhi mark-up penawaran
Faktor sukses kemitraan antara kontraktor dan subkontraktor pada proyek mall di Surabaya