Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Identifikasi keterlambatan pengiriman produk departemen produksi extrussion blow molding di PT X Surabaya
Author
Oktapia, Alvenia
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2018
Language
Indonesian
ISBN
-
Series
Skripsi No. 01022155/IND/2018
Subject(s)
INDUSTRIAL MANAGEMENT
PRODUCTION PLANNING
Notes
. Bibliography: p. 60.
Abstract
-
Physical Dimension
Number of Page(s)
xii, 60 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03331/18
(T) IND 01-2155
Library - 8th Floor
Available
Similar Collection
by author or subject
Beyond measure
Analisa dan perencanaan perbaikan Produktivitas di PT. Jatim Taman Steel
Penentuan perencanaan produksi baki dengan metode programa linier untuk mendapatkan ongkos produksi yang minimum pada PT "X" di Surabaya
Menentukan jumlah pembelian kopra dengan meminimumkan total harga pembelian kopra tanpa adanya penumpukan persediaan untuk memenuhi penjualan
Manufacturing resource planning (mrp ii)
Ethnos oblige
Analisa kelayakan pembelian mesin packaging IKG pada PT. X berdasarkan aspek teknis, lingkungan kerja, dan finansial
Studi perancanagan pembentukan departemen production planning and control di PT. E.T.A Indonesia