Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa kinerja manufacturing resource planning (MRP II) untuk produk filamen dan anchor di PT. Cahaya Angkasa Abadi
Author
Himawan, Fendy
Additional Author(s)
Gaynel, Hans
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01/0764/IND/2004
Subject(s)
INVENTORY CONTROL
PRODUCTION PLANNING
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xviii, 257 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01277/04
(T) 658.787 Him A
-
Unavailable : Removed
Similar Collection
by author or subject
Perencanaan kebutuhan bahan baku di PT Jaya Makmur
Production planning and industrial scheduling
Effeciency improvement plan with kaizen methodology in pre-wiring and preparation station of SM6 line at PT Schneider Indonesia
Kaizen for the shopfloor
Penentuan metode lost sixing yang tepat untuk kondisi supply contract with quantity flexibility dan penyusutan bahan baku
Penentuan kapasitas produksi serta pengaruhnya terhadap biaya produksi di PT "X"
Perbandingan metode lot for lot policy after stage 1 dan forecast beyond the planning horizon untuk perencanaan kebutuhan material di PT Golden Rubberindo
LKP : PT Sumber Djaja Perkasa Surabaya