Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perancangan 5s pada departemen paku pt. surabaya wire
Author
Pratomo, Dian
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2005
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01040964/IND/2005
Subject(s)
PRODUCTION PLANNING
PRODUCTION ENGINEERING
Notes
Appendix: p. 64-116
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xii, 116 p.
Dimension
30 cm.
Other Desc.
-
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01800/05
(T) - 658.5 Pra P
-
Unavailable : Removed
Similar Collection
by author or subject
Analisis peningkatan kapasitas produksi di PT "X" dengan metode simulasi
Production planning and industrial scheduling
Peningkatan kapasitas produksi melalui perbaikan ulang tata letak fasilitas line sensor zcke others PT Schneider Electric Manufacturing Batam
Perencanaan dan pengendalian produksi di pt. Interkraft
Perancangan sistem just in time untuk menurunkan lead time pada area 7 dan 8 di PT X
Upaya perbaikan proses pencatatan jumlah barang hasil produksi di PT. X
Pengendalian persediaan bahan baku dengan metode MRP di PT Subaindo Cahaya Polintraco
Sistem informasi manajemen inventori dan perencanaan produksi pada perusahaan "x"