Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi tentang vehicle routing problem with time windows (vrptw) dengan menggunakan metode simulated annealing
Author
Hun, Donald
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2005
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01010989/IND/2005
Subject(s)
PRODUCTION SCHEDULING
PRODUCTION MANAGEMENT
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xi, 132 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00530/06
(T) - 658.53 Hun S
-
Unavailable : Removed
Similar Collection
by author or subject
Disposal management system PT "X"
Pengukuran kinerja perusahaan distributor kabel menggunakan metode balanced scorecard
Manajemen bisnis dan pengembangan fungsi produksi/operasi bisnis garam beryodium pada perusahaan keluarga PT. Susanti Megah
Peranan ramalan penjualan dalam meningkatkan efisiensi dan efektifitas produksi di perusahaan "X"
Peranan material handling dalam efisiensi biaya produksi pada PT Dakar foam Utama
Lean manufacturing
Construction project scheduling and control
Penilaian desain produk untuk tujuan perakitan