Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi tentang vehicle routing problem with time windows (vrptw) dengan menggunakan metode simulated annealing
Author
Hun, Donald
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2005
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01010989/IND/2005
Subject(s)
PRODUCTION SCHEDULING
PRODUCTION MANAGEMENT
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xi, 132 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00530/06
(T) - 658.53 Hun S
-
Unavailable : Removed
Similar Collection
by author or subject
Pengendalian proses pada sistem manajemen mutu ISO 9000 (studi kasus pada PT. Tatamulia Nusantara Indah)
Penjadualan dan inventory control produk-produk job order di PT. X Sidoarjo
Build-to-order and mass customization
ERP
Evaluasi dan perbaikan bill of material di PT X.
Manufacturing planning and control for supply chain management
Pengukuran efisiensi teknis dan ekonomis dari proses produksi di PT Sinar Djaja Can
Sistem penjadwalan di PT. Mulya Petra