Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penurunan bottleneck di PT. 'XYZ' dengan pendekatan simulasi
Author
Santoso, Andri
Additional Author(s)
Steven, Antonio Erik
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2005
Language
Indonesian
ISBN
-
Series
No.01011008/IND/2005
Subject(s)
PRODUCTION CONTROL
PRODUCTION MANAGEMENT
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xii, 85 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00550/06
(T) - 658.56 San P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Perencanaan dan Pengendalian Persediaan Bahan Baku di PT. IGA ABADI
Perancangan sistem manajemen mutu iso 9001:2000 di PT Jaya Garmen Sukses Makmur
Penurunan waktu changeover dengan metode SMED di PT. Schneider Electric Manufacturing Batam-Plant Electro Mechanic
Perencanaan tenaga kerja yang efektif pada perusahaan kecap cap jeruk pecel tulen
Peningkatan proses pada line assembly switch menggunakan metode video-analysis di PT Schneider Electric Ltd.
Usulan upaya pengurangan downtime mesin potong single deck di PT. 'X'
Perancangan perubahan metode pergantian dies pada departemen kawat di PT Surabaya Wire
Automation, production systems and computer integrated manufacturing