Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penurunan bottleneck di PT. 'XYZ' dengan pendekatan simulasi
Author
Santoso, Andri
Additional Author(s)
Steven, Antonio Erik
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2005
Language
Indonesian
ISBN
-
Series
No.01011008/IND/2005
Subject(s)
PRODUCTION CONTROL
PRODUCTION MANAGEMENT
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xii, 85 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00550/06
(T) - 658.56 San P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Analisa down time produksi dan kontaminasi bahan di PT. X
Penurunan tingkat kecacatan pada kemasan air minum di PT. X
How to implement lean manufacturing
Manufacturing planning and control for supply chain management
Analisis pemilihan pola produksi ekonomis untuk memenuhi rencana penjualan pada pabrik biskuit "MW" di Ujung Pandang
Analisis pengurangan waiting time di lintasan original equipment manufacturing 1 PT Guntner Indonesia
Peran anggota keluarga dalam pengelolaan bisnis keluarga : studi kasus pada pengelolaan produksi dan operasional
Upaya peningkatan uptime mesin mentholator di PT H. M. Sampoerna Tbk