Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa output produksi pipa GTE (Galvanized Threading End) pada proses threading di PT Spindo unit III
Author
Sutanto, Cindy
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2012
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021601/IND/2012
Subject(s)
PRODUCTION MANAGEMENT
INPUT-OUTPUT ANALYSIS
Notes
Appendix : p. 54 - 124
Bibliography : p. 52
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 124 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
04175/12
(T) 658.5 Sut A
-
Unavailable : Removed
Similar Collection
by author or subject
Analisis pengurangan waiting time di lintasan original equipment manufacturing 1 PT Guntner Indonesia
Manajemen produksi/operasi
Penentuan kombinasi jumlah produksi yang optimal dengan menggunakan metode simplex pada PT King Halim Jewerly Surabaya
Penerapan sistem material requirements planning (MRP) sebagai alat untuk meningkatkan efisiensi biaya persediaan bahan baku pada PT. Siantarjaya Ekatama Surabaya
Perancangan job description, sistem pencatatan, dan penyempurnaan sistem 5S di bagian gudang benang PT. XXX
Maksimasi produksi aggregate plant dengan pendekatan matematis (studi kasus aggregate plant PT. Perwita Karya)
Speed to market
Pengurangan setup dalam usaha pengoptimalan investasi