Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : PT Baja Utama Danastri Surabaya
Author
Viktor T.
Additional Author(s)
Lie, We Liang
Sucipto, Jemmy
Publisher
Surabaya: Madison Square Press, 1998
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek II no. 98.2.014
Subject(s)
PRODUCTION ENGINEERING
PRODUCTION MANAGEMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
vii, 35 p.
Dimension
30 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01921/99
L 621.8 Vik L-II
Library - 6th Floor
Available
Similar Collection
by author or subject
LKP : PT Indoplast Megah Surya Perkasa
Penetapan ratio kecepatan roll pada mesin extruder stretching untuk menetapkan kualitas benang
Peningkatan ketepatan pendataan line stop guna menurunkan loss time pada proses assembly drive chain dan cam chain di PT. XYZ
Pengurangan lead time produksi mcset di PT. Schneider Indonesia
Studi kelayakan perluasan perusahaan plastik Sumber Mulya Putra
Perancangan fasilitas dan metode kerja yang ergonomis di PT. Friendship.
Perencanaan produksi dan pengendalian inventory di Jaya Metal Coating
Operations management