Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : PT Baja Utama Danastri Surabaya
Author
Viktor T.
Additional Author(s)
Lie, We Liang
Sucipto, Jemmy
Publisher
Surabaya: Madison Square Press, 1998
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek II no. 98.2.014
Subject(s)
PRODUCTION ENGINEERING
PRODUCTION MANAGEMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
vii, 35 p.
Dimension
30 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01921/99
L 621.8 Vik L-II
Library - 6th Floor
Available
Similar Collection
by author or subject
Peningkatan output produksi dengan metode SMED di area busbar PT Schneider Electric Indonesia
Perencanaan produksi berdasarkan kombinasi produk optimal pada PT August Print di Surabaya
Advances in ergonomics of manufacturing: managing the enterprise of the future
Operations management
Integrated production and inventory management
Perancangan agenda operator dan perbaikan modul development sebagai tools dalam pencapaian HPWT di PT X
E-supply chain
Penerapan weekly order change untuk mengurangi jangka waktu pemesanan komponen ekspor di PT Toyota Motor Manufacturing Indonesia