Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Pengoptimalan rute & jadwal rutin kendaraan di PT Gunung Arta Manunggal
Author
Padmawidjaja, Liestya
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2005
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01040939/IND/2005
Subject(s)
SCHEDULING
PRODUCTION MANAGEMENT
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xii, 159 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00628/06
(T) - 658.53 Pad P
-
Unavailable : Removed
Similar Collection
by author or subject
Pengoptimalan rute & jadwal rutin kendaraan di PT Gunung Arta Manunggal
Analisis dan perancangan perbaikan sistem perencanaan produksi di PT. X
LKP : PT Arta Glory Buana Sidoarjo
Penjadwalan produksi dan pengendalian persediaan dengan tujuan optimalisasi biaya produksi pada divisi paku PT Surabaya Wire (suatu pendekatan program dinamis)
Penentuan kebijakan sistem produksi didasarkan atas penambahan tenaga kerja dan mesin yang optimal
Period batch control
Penjadwalan produksi divisi wood processing dan laminating di CV Sinar Baja Electric
Operations management in hospitality industry