Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa perbandingan nilai produktivitas tenaga kerja dengan menggunakan metode standard dan aktual (studi kasus pada proyek X dan Y)
Author
Trisiany, Eka Muliana
Additional Author(s)
Halim, Edy
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.20121465/SIP/2006
Subject(s)
INDUSTRIAL PROJECT MANAGEMENT
DECISION-MAKING-MATHEMATICAL MODEL
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xviii, 106 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01895/06
(T) - 658.404 Tri A
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Faktor-faktor yang dapat menciptakan keunggulan bersaing bagi pengembang Ruko di Surabaya
Analisa percepatan durasi aktivitas sebagai antisipasi keterlambatan proyek
Analisa faktor-faktor yang mempengaruhi strategi perusahaan yang berdampak pada penetapan harga produk realestate di Surabaya
Aplikasi material requirement planning untuk mengendalikan investasi pengadaan material pada PT. JHS Pilling System
Analisis pengaruh variabel sikap, keahlian dan pengetahuan terhadap kompentensi manajemen perusahaan konstruksi dari sudut pandang owner, konsultan dan sub kontraktor...
Studi kelayakan hotel bintang dua di Surabaya dilihat dari aspek pasar dan aspek keuangan
Project management
Studi kasus pembuatan shop drawing pada proyek grande water place residences phase 1 Surabaya