Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa perbandingan nilai produktivitas tenaga kerja dengan menggunakan metode standard dan aktual (studi kasus pada proyek X dan Y)
Author
Trisiany, Eka Muliana
Additional Author(s)
Halim, Edy
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.20121465/SIP/2006
Subject(s)
INDUSTRIAL PROJECT MANAGEMENT
DECISION-MAKING-MATHEMATICAL MODEL
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xviii, 106 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01895/06
(T) - 658.404 Tri A
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Pengendalian pelaksanaan struktur gedung bertingkat untuk menghasilkan cara kerja yang efektip
Management by projects
Planning, performing, and controlling projects
Faktor-faktor yang mempengaruhi pemeliharaan ditinjau dari pengorganisasian tenaga kerja dan biaya pemeliharaan apartemen dan kondominium
Pembuatan model utilitas untuk faktor-faktor internal dalam strategi tender
Monitoring jadwal suatu proyek sekolah dengan menggunakan metode SPI dan PPC
Tingkat kepentingan dan alokasi resiko pada proyek konstruksi
Analisis efisiensi layanan beberapa supplier makro margomulyo dengan metode data envelopment analysis