Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Monitoring jadwal suatu proyek sekolah dengan menggunakan metode SPI dan PPC
Author
Sukiman, Vincent
Additional Author(s)
Tjiptorahardjo, Yohanes Y. F.
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2016
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012138/SIP/2016
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
INDUSTRIAL PROJECT MANAGEMENT
Notes
Appendix: p. 39-73
. Bibliography: p. 38 .
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 73 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01006/17
(T) SIP 2138
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Survey pemanfaatan teknologi informasi pada industri konstruksi di Surabaya
Pandangan kontraktor mengenai kualitas dokumen desain dan dampaknya pada proses konstruksi
Construction management
Faktor-faktor yang mempengaruhi labor turnover dan dampaknya pada proyek konstruksi di Surabaya
Perubahan harga BBM terhadap biaya konstruksi rumah sehat sederhana (RSH)
Studi kasus penerapan rekayasa nilai pada suatu proyek rumah tinggal
Perbandingan produktivitas pekerja konstruksi berdasarkan perbedaan waktu (pagi hari & siang hari)
The Characteristics of innovative construction project: a study in Thailand construction industry