Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Aplikasi program penjadualan dan fungsi kontrol bagian PPC di PT Lestari Karya Makmur
Author
Gunawan, Andreas
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01041130/IND/2006
Subject(s)
QUALITY CONTROL
PRODUCTION MANAGEMENT
PRODUCTION SCHEDULING
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xi, 136 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
04555/06
(T) - 658.562 Gun A
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Perancangan kampanye iklan layanan masyarakat tentang kepedulian dalam membina hubungan kerja yang baik antara majikan dan pembantu rumah tangga
Pengaruh perubahan sistem manajemen terhadap kinerja perusahaan secara keseluruhan di UD. Angka Baru
Perancangan dan implementasi 5S di P.T. Ekasapta Hidupmaju
Pengoptimalan alokasi tenaga kerja pada bagian refinery dan fractionation di PT. Smart Tbk.
Penentuan reward di PT Fuboru Indonesia
Upaya mengurangi keterlambatan proses produksi PT. Aweco Indosteel Perkasa
Perancangan keseimbangan lintasan produksi dan penentuan jumlah operator yang optimal di perusahaan Mebel
Usulan perbaikan sistem sub kontrak dengan metode kepner-tregoe di PT. Terang Fajar Persada