Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Production scheduling using backward scheduling method in job shop system study case at Schneider Indonesia Ltd.
Author
Purnama, Candra
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2006
Language
English
ISBN
-
Series
Tugas Akhir No.10141083/IND/2006
Subject(s)
PRODUCTION PLANNING
SCHEDULING
Notes
Appendix: p. 86-101
Bibliography: p. 85
Abstract
-
Physical Dimension
Number of Page(s)
xv, 101 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
05115/06
(T) - 658.53 Pur P
-
Unavailable : Removed
Similar Collection
by author or subject
Prefabrication dan modular construction serta pengaruh precast terhadap scheduling proyek
Inventory control di PT. XYZ
Build-to-order and mass customization
Analisa perbandingan algoritma ant colony dengan algoritma scatter search pada flowshop scheduling
Perencanaan produksi dan pengendalian bahan baku pada PT. XYZ
Penjadwalan produksi dengan menggunakan algoritma heuristik di PT. Kappametal Surya
Penentuan perencanaan produksi baki dengan metode programa linier untuk mendapatkan ongkos produksi yang minimum pada PT "X" di Surabaya
Pengendalian persediaan bahan baku dengan metode MRP pada PT. Halim Jaya Sakti