Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Production scheduling using backward scheduling method in job shop system study case at Schneider Indonesia Ltd.
Author
Purnama, Candra
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2006
Language
English
ISBN
-
Series
Tugas Akhir No.10141083/IND/2006
Subject(s)
PRODUCTION PLANNING
SCHEDULING
Notes
Appendix: p. 86-101
Bibliography: p. 85
Abstract
-
Physical Dimension
Number of Page(s)
xv, 101 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
05115/06
(T) - 658.53 Pur P
-
Unavailable : Removed
Similar Collection
by author or subject
Penjadwalan produksi untuk meminimumkan setup time dan memaksimumkan aliran uang dengan metode genetic algorithm studi kasus pada CV. WP
Pengurangan lead time produksi panel low voltage menggunakan material replenishment di PT. Schneider Indonesia
Penentuan kebijakan sistem produksi didasarkan atas penambahan tenaga kerja dan mesin yang optimal
Perbaikan keseimbangan lintasan di lini produksi ecoss PT XYZ
Perencanaan produksi dengan mempertimbangkan kapasitas produksi pada CV. X
Perancangan manajemen energi gedung perkantoran di PT Kerta Rajasa Raya
Peningkatan sistem manajemen persediaan packaging box di PT X
Perancangan MRQ, pengontrolan persediaan material, dan pengiriman barang jadi di departemen planning PT. Filma Utama Soap