Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Production scheduling using backward scheduling method in job shop system study case at Schneider Indonesia Ltd.
Author
Purnama, Candra
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2006
Language
English
ISBN
-
Series
Tugas Akhir No.10141083/IND/2006
Subject(s)
PRODUCTION PLANNING
SCHEDULING
Notes
Appendix: p. 86-101
Bibliography: p. 85
Abstract
-
Physical Dimension
Number of Page(s)
xv, 101 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
05115/06
(T) - 658.53 Pur P
-
Unavailable : Removed
Similar Collection
by author or subject
Upaya peningkatan efisiensi produksi di PT. X
Perbaikan penjadwalan produksi dengan mempertimbangkan keseimbangan lintasan melalui metode aggregation algorithm PT Suryaraya Nusatama
Desain tenda sementara untuk tim sar dengan menggunakan metode triz
Analisa perluasan departemen material di PT. "A"
Perencanaan kapasitas yang dibutuhkan untuk memenuhi produk di PT Karya Mekar Sadewatara
Analisa kinerja manufacturing resource planning (MRP II) untuk produk filamen dan anchor di PT. Cahaya Angkasa Abadi
Prefabrication dan modular construction serta pengaruh precast terhadap scheduling proyek
Perencanaan bahan baku di CV. Solindo Tama