Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Production scheduling using backward scheduling method in job shop system study case at Schneider Indonesia Ltd.
Author
Purnama, Candra
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2006
Language
English
ISBN
-
Series
Tugas Akhir No.10141083/IND/2006
Subject(s)
PRODUCTION PLANNING
SCHEDULING
Notes
Appendix: p. 86-101
Bibliography: p. 85
Abstract
-
Physical Dimension
Number of Page(s)
xv, 101 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
05115/06
(T) - 658.53 Pur P
-
Unavailable : Removed
Similar Collection
by author or subject
Manufacturing planning and control systems
Upaya meminimasi bottle-neck di lini produksi PT. Halimjaya Sakti dengan pendekatan simulasi
Customer-driven manufacturing
Perbaikan inventory dan penjadwalan produksi untuk memenuhi demand di CV. Sukses Bersama Sejahtera
Perancangan standard operating procedures di PT. Sepanjang Baut Sejahtera
Laporan tugas: perencanaan dan perancangan produk future map
Perancangan sistem just in time untuk menurunkan lead time pada area 7 dan 8 di PT X
How to implement lean manufacturing