Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Production scheduling using backward scheduling method in job shop system study case at Schneider Indonesia Ltd.
Author
Purnama, Candra
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2006
Language
English
ISBN
-
Series
Tugas Akhir No.10141083/IND/2006
Subject(s)
PRODUCTION PLANNING
SCHEDULING
Notes
Appendix: p. 86-101
Bibliography: p. 85
Abstract
-
Physical Dimension
Number of Page(s)
xv, 101 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
05115/06
(T) - 658.53 Pur P
-
Unavailable : Removed
Similar Collection
by author or subject
Manufacturing planning and control for supply chain management
Peningkatan kapasitas produksi dengan pendekatan simulasi di pt. x
Implementasi sistem manajemen mutu ISO 9001:2000 di PT. E-T-A Indonesia
Quality function deployment
Penentuan frekuensi perencanaan ulang master production schedule dan ukuran produksi yang optimal
Analisa produktivitas di perusahaan air minum mineral dengan menggunakan metode omax
Planning and managing interior projects
Perbaikan inventory dan penjadwalan produksi untuk memenuhi demand di CV. Sukses Bersama Sejahtera