Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Production scheduling using backward scheduling method in job shop system study case at Schneider Indonesia Ltd.
Author
Purnama, Candra
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2006
Language
English
ISBN
-
Series
Tugas Akhir No.10141083/IND/2006
Subject(s)
PRODUCTION PLANNING
SCHEDULING
Notes
Appendix: p. 86-101
Bibliography: p. 85
Abstract
-
Physical Dimension
Number of Page(s)
xv, 101 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
05115/06
(T) - 658.53 Pur P
-
Unavailable : Removed
Similar Collection
by author or subject
Penjadwalan jobshop di CV Sinar Indah Teknik
Design of performance monitoring and evaluation system in Clay-Making Departments at PT Doulton Indonesia
Penjadwalan produksi dengan mempertimbangkan bottleneck di PT. Lestari Karya Makmur
Peningkatan sistem manajemen persediaan packaging box di PT X
Analisis perbandingan empat algoritma daerah sekitar untuk kasus penjadwalan
Perencanaan dan penjadualan produksi di PT.Duta Citra Audio Raya
Perancangan sistem perencanaan dan pengendalian produksi di PT. Wim Cycle
Perbaikan penjadwalan produksi dengan mempertimbangkan keseimbangan lintasan melalui metode aggregation algorithm PT Suryaraya Nusatama