Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi mengenai produktivitas tenaga kerja di proyek queen victoria
Author
Gustam
Additional Author(s)
Gunawan, Yudi
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.20121478/SIP/2006
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
LABOR PRODUCTIVITY-MEASUREMENT
Notes
Appendix: p. 76 - 142
Bibliography: p. 75
Abstract
-
Physical Dimension
Number of Page(s)
xix, 142 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
05656/06
(T) - 658.314 Gus S
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Evaluasi faktor penyebab, kuantitas, akibat dan tindakan dari sisa material pada proyek rumah tinggal
Aplikasi dan pengembangan sistem pengendalian biaya proyek untuk kontraktor (studi kasus pada suatu proyek rumah tinggal di Surabaya)
Potensi penerapan pmbok untuk kepentingan manajemen konstruksi di Surabaya
Klasifikasi upah berdasarkan produktivitas pekerja, untuk berbagai macam pekerjaan konstruksi
Perbandingan resource leveling dengan menggunakan aplikasi program microsoft project 2010 dan primavera
Penerapan sistem manajemen lingkungan berdasarkan ISO 14000 pada kontraktor-kontraktor di Surabaya
Studi kasus aplikasi critical path method with multiple calendars pada proyek graha bukopin
Perbandingan penjadwalan proyek menggunakan kurva "S" dan CPM network pada proyek "X" di Surabaya