Studi mengenai produktivitas tenaga kerja di proyek queen victoria
Author
Gustam
Additional Author(s)
Gunawan, Yudi
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.20121478/SIP/2006
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
LABOR PRODUCTIVITY-MEASUREMENT
Notes
Appendix: p. 76 - 142
Bibliography: p. 75
Abstract
-
Physical Dimension
Number of Page(s)
xix, 142 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
05656/06
(T) - 658.314 Gus S
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Construction equipment policy
Studi kasus terjadinya cacat konstruksi dengan pendekatan human error pada proyek gedung bertingkat
Keterkaitan kuantitas perkerjaan dengan durasi dan tenaga kerja pada proyek konstruksi bangunan bertingkat tinggi
Cara pendekatan perhitungan kuantitas pembesian pada kolom struktur beton bertulang
Analisis pendapat kontraktor dan pengembang yang menentukan kesuksesan perusahaan kontraktor (studi perusahaan kontraktor di Surabaya)
Analisa durasi rencana aktivitas dan evaluasi pelaksanaan jadwal pada suatu proyek konstruksi gedung bertingkat (studi kasus pada proyek "X")
Identifikasi nvaau dan studi vsm pada proyek X di Surabaya
Analisis sisa material dalam pekerjaan beton bertulang pada proyek konstruksi