Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Produktivitas pekerjaan beton bertulang untuk perhitungan harga satuan upah pekerjaan
Author
Manalu, David Freddy
Additional Author(s)
Judianto
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21011550/SIP/2007
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
LABOR PRODUCTIVITY-MEASUREMENT
Notes
Appendix
Bibliography: p. 119
Abstract
-
Physical Dimension
Number of Page(s)
xxii, 119 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03704/07
(T) - 658.314 Man P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Identifikasi faktor-faktor kritis pada proyek kerjasama operasi, studi kasus pada proyek jalan layang waru dan bandara juanda
Contractor's management handbook
Construction extension to the PMBOK guide third edition
Model matematis hubungan kinerja konsultan dan komunikasi dalam proyek konstruksi
Pengukuran efektifitas dan frekuensi faktor yang mempengaruhi produktivitas pekerja pada pekerjaan finishing proyek rumah tinggal di Surabaya
Optimasi construction site layout menggunakan metode metahueristic algorithm pada proyek great hotel Diponegoro
Program simulasi perhitungan kinerja backhoe-dump truck pada pemindahan tanah mekanis
Perkembangan sustainable construction di Indonesia dan potensi penerapannya pada tahap pelaksanaan