Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Produktivitas pekerjaan beton bertulang untuk perhitungan harga satuan upah pekerjaan
Author
Manalu, David Freddy
Additional Author(s)
Judianto
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21011550/SIP/2007
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
LABOR PRODUCTIVITY-MEASUREMENT
Notes
Appendix
Bibliography: p. 119
Abstract
-
Physical Dimension
Number of Page(s)
xxii, 119 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03704/07
(T) - 658.314 Man P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Program T-C aktivitas proyek berdasarkan produktivitas pekerja di lapangan
Studi harga satuan upah untuk proyek bangunan tinggi
Legalitas redesign dan shop drawing oleh kontraktor
Studi kasus perencanaan alokasi kebutuhan tenaga kerja pada proyek konstruksi gedung kuliah dan poliklinik Universitas Kristen Petra
Analisa spesifikasi rumah tipe 36 dalam rangka penurunan harga rumah pada Kompleks Citra Fajar Golf
Uji aplikasi program CCoBML (civil construction bill of quantity, material, and labour) untuk proyek konstruksi
Perancangan sistem informasi manajemen proses tender pada proyek konstruksi (studi kasus di PT."X")
The impact of value engineering in the design and construction process