Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Produktivitas pekerjaan beton bertulang untuk perhitungan harga satuan upah pekerjaan
Author
Manalu, David Freddy
Additional Author(s)
Judianto
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21011550/SIP/2007
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
LABOR PRODUCTIVITY-MEASUREMENT
Notes
Appendix
Bibliography: p. 119
Abstract
-
Physical Dimension
Number of Page(s)
xxii, 119 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03704/07
(T) - 658.314 Man P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Construction management of steel construction
A Decision Support for the Long Range Planning in Construction
Manajemen konstruksi
Decision and risk analysis for construction management
Construction project planning and scheduling
Safety rules and procedures development and implementation
Analisa konfik dalam perusahaan kontraktor
Pengendalian jadwal pada proyek bangunan gedung bertingkat di Surabaya dengan metode earned value management dan earned schedule