Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Produktivitas pekerjaan beton bertulang untuk perhitungan harga satuan upah pekerjaan
Author
Manalu, David Freddy
Additional Author(s)
Judianto
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21011550/SIP/2007
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
LABOR PRODUCTIVITY-MEASUREMENT
Notes
Appendix
Bibliography: p. 119
Abstract
-
Physical Dimension
Number of Page(s)
xxii, 119 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03704/07
(T) - 658.314 Man P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Analisis sisa material dalam pekerjaan beton bertulang pada proyek konstruksi
Studi kasus penerapan metode collapsed as-built terhadap sebuah bangunan perkuliahan di kota Surabaya
Hubungan antara budaya organisasi dan tingkat kepercayaan pada perusahaan kontraktor di Surabaya
Studi kasus penerapan metode pert pada proyek gudang
Analisis frekuensi, dampak, dan jenis keterlambatan pada proyek konstruksi
Studi kasus faktor-faktor yang dapat meningkatkan kualitas sdm sebagai modal dasar untuk menciptakan suatu perusahaan yang sehat
Peranan manajer proyek sebagai pemimpin dalam membangun kepercayaan pada proyek konstruksi di Surabaya
Analisa aspek-aspek dalam prosedur change order pada proyek konstruksi