Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Produktivitas pekerjaan beton bertulang untuk perhitungan harga satuan upah pekerjaan
Author
Manalu, David Freddy
Additional Author(s)
Judianto
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21011550/SIP/2007
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
LABOR PRODUCTIVITY-MEASUREMENT
Notes
Appendix
Bibliography: p. 119
Abstract
-
Physical Dimension
Number of Page(s)
xxii, 119 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03704/07
(T) - 658.314 Man P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Identifikasi dan penanganan keterlambatan pekerjaan struktur dan finishing pada proyek sekolah 'X'
Computer-based construction project management
Pre-contract practice
Pengembangan elemen discrete kirchhoff midlin quadrilateral (DKMQ) untuk analisis pelat lipat komposit
Analisa perhitungan/kalkulasi pemakaian peralatan & mesin lainnya.
Analisa penggembangan produk properti berdasarkan aspek non finansial dan aspek finansial
Scheduling construction projects
Survei kepuasan pengguna ruko terhadap jasa broker properti Surabaya