Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Faktor-faktor permasalahan pengembangan perusahaan kontraktor di Tana Toraja
Author
Masiku, Henrianto
Additional Author(s)
-
Publisher
Surabaya: Program Pascasarjana Teknik Sipil Magister Teknik UK Petra , 2008
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01000124/MTS/2008
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix: p. 46 - 80
Bibliography: p. 44 - 45
Abstract
-
Physical Dimension
Number of Page(s)
x, 80 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03202/08
(T2) - 658.924 Mas F
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Identifikasi dan peringkat kriteria-kriteria prakualifikasi konsultan perencana dan konsultan pengawas
Aplikasi material requirement planning untuk mengendalikan investasi pengadaan material pada PT. JHS Pilling System
Perhitungan produktivitas tenaga kerja pada pekerjaan pembesian dengan metode level of effort (studi kasus pada proyek X dan Y)
Construction planning and scheduling
Perencanaan site layout proyek konstruksi dengan menggunakan integrated cad-based model
Survei penerapan konsep sustainable construction di negara berkembang dan kemungkinan penerapannya di Indonesia
Model pengendalian biaya dan resiko (pada perumahan graha famili, Surabaya)
Perbandingan komposisi pekerja pasangan dinding bata antara SNI 2008 dengan kenyataan di lapangan...