Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Upaya pencapaian target produksi di PT. Nayati Indonesia
Author
Sandranita, Irene
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01011084/IND/2006
Subject(s)
PRODUCTION MANAGEMENT
Notes
Appendix: p. 58 - 70
Bibliography: p. 57
Abstract
-
Physical Dimension
Number of Page(s)
xii, 70 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
05999/06
(T) - 658.5 San U
-
Unavailable : Removed
Similar Collection
by author or subject
Analisa peningkatan output produksi pipa galvanized thread end dengan pendekatan simulasi di PT Spindo unit 3
Penurunan tingkat kecacatan di PT. Bondi Syad Mulia
Process improvement using mtm-uas analysis at switch assembly line in schneider electric Indonesia Ltd.
Operations and supply management
Pengidentifikasian waste melalui value stream mapping dan upaya pengurangan waste pada Departemen PK PT X
Tantangan industri manufaktur
Perancangan dan pengembangan produk perasan kelapa parut di PT. X
Penurunan waktu dandori dan standarisasi kerja di Plant PI-GS area 7 dan 8 PT Astra Otoparts Divisi Adiwira Plastik