Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Evaluasi kinerja metode heuristik untuk meminimumkan makespan dalam penjadwalan fleksible flowshop
Author
Jacklyn, Alexandra
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01011150/IND/2007
Subject(s)
PRODUCTION PLANNING
SCHEDULING
Notes
Appendix: p. 50 - 98
Bibliography: p. 49
Abstract
-
Physical Dimension
Number of Page(s)
xii, 98 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00664/07
(T) - 658.53 Jac E
-
Unavailable : Removed
Similar Collection
by author or subject
Production scheduling using backward scheduling method in job shop system study case at Schneider Indonesia Ltd.
Perancangan sistem perencanaan produksi dan pengendalian persediaan bahan baku di pt. sarana graha ideal
Membandingkan algoritma tabu search ben-fawzan dengan solusi awal neh dan algoritma tabu search ben-fawzan dengan solusi awal CDS pada permasalahan Flow shop
Perencanaan penggunaan base paper pada unit coating dan finishing machine NCR dengan menggunakan program delphi 7.0 di CV Dirgahayu
LKP : PT Sumber Djaja Perkasa Surabaya
Evaluasi penerapan transfer teknologi pada delapan perusahaan manufaktur di Surabaya dan sekitarnya
Perancangan sistem pengukuran kinerja dengan metode integrated performance measurement systems di PT. Cahaya Angkasa Abadi
Peningkatan produktivitas produk D16D di assembly line A PT Astra Otoparts divisi Adiwira Plastik