Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Evaluasi kinerja metode heuristik untuk meminimumkan makespan dalam penjadwalan fleksible flowshop
Author
Jacklyn, Alexandra
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01011150/IND/2007
Subject(s)
PRODUCTION PLANNING
SCHEDULING
Notes
Appendix: p. 50 - 98
Bibliography: p. 49
Abstract
-
Physical Dimension
Number of Page(s)
xii, 98 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00664/07
(T) - 658.53 Jac E
-
Unavailable : Removed
Similar Collection
by author or subject
Analisa perbandingan metode local search pada algoritma ant colony untuk menyelesaikan permasalahan penjadwalan flowshop
Penjadwalan produksi flowshop dengan avolosionary algorithms untuk non unique jobs
Perencanaan dan pengendalian jadwal pekerjaan finishing proyek rumah tinggal dengan metode Activity on Node (AON)
The lean design guidebook
Penjadualan dan inventory control produk-produk job order di PT. X Sidoarjo
Penjadualan mesin paralel dengan metode dinamis fun (fuzzy-neuro) di PT Supra Aspindo Jaya
Analisis perbandingan metode penjadwalan batch multi item dengan kombinasi algoritma tabu search dan ant colony (studi kasus pada CV Sinar Baja Electric)
Penentuan temperatur optimal metode SA-MDJ dibandingkan dengan metode NEH untuk penjadualan flow shop