Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penentuan pergantian mata pisau potong pada mesin extruder besar line 40 dengan pendekatan simulasi di PT X
Author
Sinjoyo, Eric
Additional Author(s)
Kusuma, Henry Wijaya
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tgas Akhir No.01041183/IND/2007
Subject(s)
PRODUCTION MANAGEMENT
SIMULATION METHOD
Notes
Bibliography: p. 75
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 75 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00813/07
(T) - 658.5 Sin P
-
Unavailable : Removed
Similar Collection
by author or subject
Penentuan kebijakan sistem produksi didasarkan atas penambahan tenaga kerja dan mesin yang optimal
Studi kelayakan perluasan perusahaan sepatu dan topi CV. XYZ
Operations and process management
Innovative control charting
Analisis tingkat rasio absensi dan keterlambatan terhadap pencapaian target produksi di PT Rimba Kencana, Banyuwangi
Kanban for altivar/inverter production at PT Schneider Electric Manufacturing Batam
The User's journey
Misselection analyzing and productivity improvement at biscuit selection department in PT Doulton