Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penentuan pergantian mata pisau potong pada mesin extruder besar line 40 dengan pendekatan simulasi di PT X
Author
Sinjoyo, Eric
Additional Author(s)
Kusuma, Henry Wijaya
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tgas Akhir No.01041183/IND/2007
Subject(s)
PRODUCTION MANAGEMENT
SIMULATION METHOD
Notes
Bibliography: p. 75
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 75 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00813/07
(T) - 658.5 Sin P
-
Unavailable : Removed
Similar Collection
by author or subject
Analisa kualitas pengerjaan produk penta floor epoxy pada PT. Bina Adidaya di Surabaya
Perbaikan sistem pengendalian kualitas pada divisi karet di PT. HRL International
LKP : PT. Bumi Wijaya Indah Kencana
Operations management for competitive advantage
LKP: perancangan sistem pengendalian persediaan di PT Dwi Sata Foam Jl. Simorejosari B3 Surabaya
Characteristics of modern production
Managing business process flows
Implementasi sistem kanban pada mechanical assembly drawer line di PT Schneider Electric Indonesia