Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perhitungan produktivitas tenaga kerja pada pekerjaan pembesian dengan metode level of effort (studi kasus pada proyek X dan Y)
Author
Gunardi, Allen Virtanius
Additional Author(s)
Wibowo, Lukas Hari
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.20121512/SIP/2007
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
LABOR PRODUCTIVITY-MEASUREMENT
Notes
Appendix: p. 59 - 111
Bibliography: p. 58
Abstract
-
Physical Dimension
Number of Page(s)
xviii, 111 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00885/07
(T) - 658.314 Gun P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Analisis pendapat kontraktor dan pengembang yang menentukan kesuksesan perusahaan kontraktor (studi perusahaan kontraktor di Surabaya)
Studi awal supply chain management pada kontraktor-kontraktor di Surabaya
Identifikasi dan alokasi risiko-risiko pada proyek superblok di Surabaya
Marine works with cost estimation for ashkelon desalination project
Produktivitas pengecoran beton ready-mixed dengan concrete pump dan tower crane (Studi Kasus: Proyek Ciputra World Surabaya)
Perbandingan produktivitas pekerja konstruksi berdasarkan perbedaan waktu (pagi hari & siang hari)
The impact of value engineering in the design and construction process
Penentuan produktivitas tenaga kerja pada proyek gudang struktur baja berdasarkan durasi pert (project evaluation review technique)