Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perbandingan produktivitas pekerja konstruksi berdasarkan perbedaan waktu (pagi hari & siang hari)
Author
Admaja, Handoyo Kusuma
Additional Author(s)
Kangmartono, Sutawijaya
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.20401519/SIP/2007
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
CONSTRUCTION INDUSTRY-PERSONNEL MANAGEMENT
Notes
Apppendix: p. 91 - 143
Bibliography: p. 90
Abstract
-
Physical Dimension
Number of Page(s)
xviii, 143 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01355/07
(T) - 690.068 Adm P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Sistem perencanaan dan penjadwalan linear untuk proyek bangunan industri pergudangan
Faktor-faktor manusia yang mempengaruhi penolakan SDM dalam menjalankan sistem informasi berbasis teknologi informasi (studi pada SDM perusahaan konstruksi di Surabaya)
Monitoring dan analisis jadwal proyek menggunakan metode performance intensity dan CPM pada proyek hotel
Perencanaan site layout proyek konstruksi dengan menggunakan integrated cad-based model
Analisa pelaksanaan time management proyek konstruksi pada perusahaan kontraktor di Surabaya
Peranan broker properti dalam pemasaran produk real estate
Potensi penerapan pmbok untuk kepentingan manajemen konstruksi di Surabaya
Construction methods and management