Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Identifikasi faktor-faktor kritis pada proyek kerjasama operasi, studi kasus pada proyek jalan layang waru dan bandara juanda
Author
Yessianto, Fellix
Additional Author(s)
Tedjo, Heriyanto Kusuma
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2005
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.20301434/SIP/2005
Subject(s)
INDUSTRIAL PROJECT MANAGEMENT
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xxi, 124 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02870/05
(T) - 658.404 Yes I
Library - 8th Floor
Under maintenance
Similar Collection
by author or subject
Pengukuran produktivitas pekerjaan dinding lite block dan hebel : studi kasus pada proyek x
Penyiapan bar bending schedule untuk proyek konstruksi
Studi optimasi perencanaan site layout pada proyek konstruksi dengan menggunakan program quantitative system verson 3.0
Pre-contract practice
Evaluasi kelayakan investasi proyek pada perusahaan pengalengan ikan tuna/cakalang PT. 'CRAC' di kota 'S' Irian Jaya
Penerapan material requirement planning pada suatu proyek konstruksi
Hubungan antara proses kepemimpinan pelaksana proyek dengan ukuran produktivitas mandor pada mall di Surabaya
Construction project management