Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Identifikasi faktor-faktor kritis pada proyek kerjasama operasi, studi kasus pada proyek jalan layang waru dan bandara juanda
Author
Yessianto, Fellix
Additional Author(s)
Tedjo, Heriyanto Kusuma
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2005
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.20301434/SIP/2005
Subject(s)
INDUSTRIAL PROJECT MANAGEMENT
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xxi, 124 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02870/05
(T) - 658.404 Yes I
Library - 8th Floor
Under maintenance
Similar Collection
by author or subject
Proporsi biaya tiap satuan pekerjaan struktur beton bertulang proyek konstruksi bangunan tinggi
Optimasi construction site layout menggunakan metode metahueristic algorithm pada proyek great hotel Diponegoro
Harapan dan realita sistem manajemen mutu ISO 9000 dalam penerapannya di perusahaan kontraktor
Pemodelan quality culture dan organizational climate pada perusahaan kontraktor
Model penilaian sukses proyek konstruksi dengan sasaran performa jadwal
The impact of value engineering in the design and construction process
Studi optimasi perencanaan site layout pada proyek konstruksi dengan menggunakan program quantitative system verson 3.0
Investment, procurement adn performance in construction