Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Identifikasi faktor-faktor kritis pada proyek kerjasama operasi, studi kasus pada proyek jalan layang waru dan bandara juanda
Author
Yessianto, Fellix
Additional Author(s)
Tedjo, Heriyanto Kusuma
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2005
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.20301434/SIP/2005
Subject(s)
INDUSTRIAL PROJECT MANAGEMENT
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xxi, 124 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02870/05
(T) - 658.404 Yes I
Library - 8th Floor
Under maintenance
Similar Collection
by author or subject
Proporsi komponen biaya harga bahan, upah, dan alat pada proyek konstruksi bangunan tinggi
Studi tentang faktor-faktor penentu dalam pemilihan jenis kontrak untuk proyek konstruksi
Tantangan yang berpengaruh dan keterampilan manajer proyek pada proyek bangunan hijau
Analisis jadwal pelaksanaan pekerjaan struktur proyek 6 lantai dengan menggunakan program microsoft project 2003
Studi tentang produktivitas kelompok pekerja pada pekerjaan pasangan bata di proyek perumahan
Legalitas redesign dan shop drawing oleh kontraktor
Studi tentang manajemen pekerja bangunan untuk pemborong pemula di Surabaya
Studi tentang perencanaan tapak dan analisis hubungan lebar jalan terhadap luas dan harga jual kapling pada beberapa perumahan di Surabaya