Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Identifikasi faktor-faktor kritis pada proyek kerjasama operasi, studi kasus pada proyek jalan layang waru dan bandara juanda
Author
Yessianto, Fellix
Additional Author(s)
Tedjo, Heriyanto Kusuma
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2005
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.20301434/SIP/2005
Subject(s)
INDUSTRIAL PROJECT MANAGEMENT
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xxi, 124 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02870/05
(T) - 658.404 Yes I
Library - 8th Floor
Under maintenance
Similar Collection
by author or subject
Studi tentang project closeout pada proyek gedung T (gedung kuliah dan poliklinik) Universitas Kristen Petra
Studi kasus penerapan rekayasa nilai pada suatu proyek rumah tinggal
Peranan manajer proyek sebagai pemimpin dalam membangun kepercayaan pada proyek konstruksi di Surabaya
Evaluasi aspek-aspek kinerja owner pada proyek konstruksi
Kontrol material pada proyek konstruksi perumahan
Motivasi kerja pekerja pada beberapa proyek konstruksi di Surabaya
Construction management
Construction production planning and optimal control