Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Model penilaian sukses proyek konstruksi dengan sasaran performa jadwal
Author
Intan, Iskandar Guli
Additional Author(s)
-
Publisher
Surabaya: Program Pascasarjana Teknik Sipil Magister Teknik UK Petra , 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01000087/MTS/2006
Subject(s)
CONSTRUCTION INDUSTRY
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 90 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02351/06
(T2) - 690.068 Int M
Library - 8th Floor
Under maintenance
Similar Collection
by author or subject
Perpustakaan kota di Surabaya
Sistem jaminan kualitas dan biaya kualitas pada proyek tangki elpiji
Studi kasus faktor-faktor yang dapat meningkatkan kualitas sdm sebagai modal dasar untuk menciptakan suatu perusahaan yang sehat
The Breeden realty office building construction schedule
Analisis biaya elemental untuk perencanaan biaya proyek hotel
Aplikasi material requirement planning untuk mengendalikan investasi pengadaan material pada PT. JHS Pilling System
Hubungan antara taktik dan hasil negosiasi dalam penyelesaian sengketa jasa konstruksi
Perbandingan sistem tunggal dan sistem ganda struktur baja rangka terbreis konsentris khusus berbentuk V terbalik dengan direct analysis method