Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perencanaan dan pengendalian jadwal proyek: studi kasus proyek X
Author
Widjaya, Irwan
Additional Author(s)
Santoso, Maryanti
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21011557/SIP/2007
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix: p. 98 - 177
Bibliography: p. 97
Abstract
-
Physical Dimension
Number of Page(s)
xx, 177 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03684/07
(T) - 690.068 Wid P
-
Unavailable : Removed
Similar Collection
by author or subject
Model simulasi um-cyclone pada operasional perusahaan beton siap pakai (studi kasus PT. Jatim Readymix)
Value engineering in construction management
Model pengaruh iklim keselamatan terhadap perilaku keselamatan dengan determinan pengetahuan dan motivasi pada proyek konstruksi
Analisis komparasi dan pengaruh beberapa variabel terhadap kepuasan hunian dan lokasi citra raya dan graha famili
Proporsi biaya tiap satuan pekerjaan struktur beton bertulang proyek konstruksi bangunan tinggi
Evaluasi produktivitas kerja struktur kolom, balok dan plat di proyek Tunjungan Plaza 6
Jenis pekerjaan yang mendominasi komposisi biaya pada proyek apartemen
Analisa perhitungan/kalkulasi pemakaian peralatan & mesin lainnya.