Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perencanaan dan pengendalian jadwal proyek: studi kasus proyek X
Author
Widjaya, Irwan
Additional Author(s)
Santoso, Maryanti
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21011557/SIP/2007
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix: p. 98 - 177
Bibliography: p. 97
Abstract
-
Physical Dimension
Number of Page(s)
xx, 177 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03684/07
(T) - 690.068 Wid P
-
Unavailable : Removed
Similar Collection
by author or subject
Pengaruh tindakan tidak aman (unsafe act) dan kondisi tidak aman (unsafe condition) terhadap kecelakaan kerja konstruksi
Perbandingan tingkat kepentingan dan kepuasan antara insentif finansial dan insentif non-finansial bagi staf karyawan lapangan dan kantor
Penyiapan sarana untuk evaluasi kemajuan proyek konstruksi
Pandangan konsultan perencana mengenai kualitas dokumen desain dan faktor-faktor yang mempengaruhinya
Tingkat kepuasan penghuni dalam menempati apartemen sejahtera
Program perhitungan efektivitas penggunaan tower crane pada bangunan bertingkat
Management development
Evaluasi faktor penyebab, kuantitas, akibat dan tindakan dari sisa material pada proyek rumah tinggal