Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perencanaan dan pengendalian jadwal proyek: studi kasus proyek X
Author
Widjaya, Irwan
Additional Author(s)
Santoso, Maryanti
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21011557/SIP/2007
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix: p. 98 - 177
Bibliography: p. 97
Abstract
-
Physical Dimension
Number of Page(s)
xx, 177 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03684/07
(T) - 690.068 Wid P
-
Unavailable : Removed
Similar Collection
by author or subject
Analisa faktor dan uji diskriminan terhadap kepuasan penghuni apartemen sekitar kampus di Surabaya
Studi tentang pengamatan standar waktu dan produktivitas pekerjaan konstruksi
Perbandingan kinerja bangunan yang didesain dengan force-based design dan direct displacement-based design menggunakan SNI gempa 2012
Perbandingan waktu tempuh ideal dan waktu tempuh aktual tower crane dalam proyek konstruksi
Penerapan value engineering pada proyek konstruksi
Analisis ekonomis sebagai dasar pengambilan keputusan dalam penggantian excavator
Studi literatur tentang penataan site pada proyek konstruksi bangunan tingkat tinggi
Studi tentang faktor-faktor penentu dalam pemilihan jenis kontrak untuk proyek konstruksi