Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perencanaan dan pengendalian jadwal proyek: studi kasus proyek X
Author
Widjaya, Irwan
Additional Author(s)
Santoso, Maryanti
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21011557/SIP/2007
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix: p. 98 - 177
Bibliography: p. 97
Abstract
-
Physical Dimension
Number of Page(s)
xx, 177 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03684/07
(T) - 690.068 Wid P
-
Unavailable : Removed
Similar Collection
by author or subject
Prediksi kinerja waktu proyek konstruksi
Optimasi site layout pada proyek konstruksi caspian tower dengan menggunakan metode metaheuristik berdasarkan traveling distance pekerja
Faktor-faktor yang mempengaruhi labor turnover dan dampaknya pada proyek konstruksi di Surabaya
Hubungan overtime dengan produktivitas pekerjaan pembesian (studi kasus pada proyek x, y, dan z)
Faktor-faktor risiko penyebab sengketa dan kejelasan pembagian tangung jawabnya
Studi kasus penjadwalan proyek pada proyek rumah toko X menggunakan microsoft project 2010
Menghitung umur penggantian berat yang optimum dengan biaya daur kehidupan yang minimum
Studi tentang produktivitas pekerjaan pasangan dinding setengah bata lantai dua pada proyek perumahan