Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Model simulasi um-cyclone pada operasional perusahaan beton siap pakai (studi kasus PT. Jatim Readymix)
Author
Lasakar, Frengky
Additional Author(s)
Frengky Lasakar
Publisher
Surabaya: 2002
Language
Indonesian
ISBN
-
Series
Tesis 053/MTS
Subject(s)
CONCRETE PRODUCTS INDUSTRY-RESEARCH
CONSTRUCTION INDUSTRY-MANAGEMENT
CONSTRUCTION INDUSTRY-RESEARCH
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xv, 277 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00180/03
(T2) 690.068 Las M
-
Unavailable : Removed
Similar Collection
by author or subject
Model simulasi um-cyclone pada operasional perusahaan beton siap pakai (studi kasus PT. Jatim Readymix)
Produktivitas tenaga kerja sebelum dan sesudah perubahan volume pada kontrak di pembangunan proyek rusun Surabaya
Analisa studi tentang kemitraan antara pengembang dengan kontraktor pada proyek perumahan di Surabaya dan Sidoarjo
Construction production planning and optimal control
Construction scheduling with primavera project planner
Principles of construction management for engineers and managers
Analisa sistem perlindungan jatuh pada proyek konstruksi di Surabaya
Analisis jadwal pelaksanaan pekerjaan struktur proyek 6 lantai dengan menggunakan program microsoft project 2003