Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Model simulasi um-cyclone pada operasional perusahaan beton siap pakai (studi kasus PT. Jatim Readymix)
Author
Lasakar, Frengky
Additional Author(s)
Frengky Lasakar
Publisher
Surabaya: 2002
Language
Indonesian
ISBN
-
Series
Tesis 053/MTS
Subject(s)
CONCRETE PRODUCTS INDUSTRY-RESEARCH
CONSTRUCTION INDUSTRY-MANAGEMENT
CONSTRUCTION INDUSTRY-RESEARCH
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xv, 277 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00180/03
(T2) 690.068 Las M
-
Unavailable : Removed
Similar Collection
by author or subject
Model simulasi um-cyclone pada operasional perusahaan beton siap pakai (studi kasus PT. Jatim Readymix)
The Characteristics of innovative construction project: a study in Thailand construction industry
Analisis tingkat kepentingan kriteria penilaian kinerja lingkungan
Identifikasi faktor-faktor kritis pada proyek kerjasama operasi, studi kasus pada proyek jalan layang waru dan bandara juanda
Sistem manajemen informasi arus kas secara terpusat (studi kasus pada PT. X )
Construction scheduling with primavera project planner
Program komputer untuk penyiapan kebutuhan tenaga kerja dalam proyek konstruksi
Model matematis hubungan kinerja konsultan dan komunikasi dalam proyek konstruksi