Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Model simulasi um-cyclone pada operasional perusahaan beton siap pakai (studi kasus PT. Jatim Readymix)
Author
Lasakar, Frengky
Additional Author(s)
-
Publisher
Surabaya: 2002
Language
Indonesian
ISBN
-
Series
Tesis No. 053/MTS
Subject(s)
CONCRETE PRODUCTS INDUSTRY-RESEARCH
CONSTRUCTION INDUSTRY-RESEARCH
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xv, 277 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00737/03
(T2) 690.068 Las M
-
Unavailable : Removed
Similar Collection
by author or subject
Model simulasi um-cyclone pada operasional perusahaan beton siap pakai (studi kasus PT. Jatim Readymix)
Penggunaan spreadsheet untuk pengendalian biaya pada proyek "rumah-toko"
Program T-C aktivitas proyek berdasarkan produktivitas pekerja di lapangan
Studi tentang perencanaan tapak dan analisis hubungan lebar jalan terhadap luas dan harga jual kapling pada beberapa perumahan di Surabaya
Studi tentang perencanaan tapak dan analisis hubungan lebar jalan terhadap luas dan harga jual kapling pada beberapa perumahan di Surabaya
Aplikasi dan pengembangan sistem pengendalian biaya proyek untuk kontraktor (studi kasus pada suatu proyek rumah tinggal di Surabaya)
Pengaruh kinerja keuangan dan faktor makro ekonomi terhadap return saham perusahaan properti di bursa efek Jakarta
Usulan sistem pengendalian biaya proyek (studi kasus kontraktor a, b dan c di Surabaya)