Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisis jadwal pelaksanaan pekerjaan struktur proyek 6 lantai dengan menggunakan program microsoft project 2003
Author
Sutanto, Agus Salim
Additional Author(s)
Ongkowijoyo, Hariono
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2008
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21011613/SIP/2008
Subject(s)
INDUSTRIAL PROJECT MANAGEMENT-COMPUTER PROGRAMS
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix
Bibliography: p. 68
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 68 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
04663/08
(T) - 658.404 Sut A
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Sistem informasi manajemen untuk pengendalian biaya proyek PT. "ABC" pada proyek "X"
Peranan manajer proyek sebagai pemimpin dalam membangun kepercayaan pada proyek konstruksi di Surabaya
Studi tentang faktor-faktor penetapan harga produk perumahan di surabaya
Analisa studi tentang kemitraan antara pengembang dengan kontraktor pada proyek perumahan di Surabaya dan Sidoarjo
Pengaruh sistem manajemen k3 terhadap waktu dan biaya proyek
Pengukuran produktivitas dan faktor-faktor yang memengaruhi pada pekerjaan konstruksi dengan metode half-slab
Sistem jaminan kualitas dan biaya kualitas pada proyek tangki elpiji
Studi kasus aplikasi critical path method with multiple calendars pada proyek graha bukopin