Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisis jadwal pelaksanaan pekerjaan struktur proyek 6 lantai dengan menggunakan program microsoft project 2003
Author
Sutanto, Agus Salim
Additional Author(s)
Ongkowijoyo, Hariono
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2008
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21011613/SIP/2008
Subject(s)
INDUSTRIAL PROJECT MANAGEMENT-COMPUTER PROGRAMS
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix
Bibliography: p. 68
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 68 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
04663/08
(T) - 658.404 Sut A
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Studi tentang faktor-faktor yang mempengaruhi perencanaan site layout proyek konstruksi di Surabaya
Perbandingan produktivitas pekerjaan pasangan dinding bata ringan dan bata merah pada proyek perumahan di Surabaya
Identifikasi dan evaluasi faktor-faktor kompetensi sosial manajer proyek
Program optimasi jumlah backhoe- dump truck dalam operasi penggalian tanah mekanis
Sistem optimalisasi penjadwalan linear scheduling method pada proyek saluran irigasi
Toekomst van de kantorenmarkt 1994-2015
Studi kasus penerapan metode collapsed as-built terhadap sebuah bangunan perkuliahan di kota Surabaya
Building production and project management