Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisis jadwal pelaksanaan pekerjaan struktur proyek 6 lantai dengan menggunakan program microsoft project 2003
Author
Sutanto, Agus Salim
Additional Author(s)
Ongkowijoyo, Hariono
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2008
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21011613/SIP/2008
Subject(s)
INDUSTRIAL PROJECT MANAGEMENT-COMPUTER PROGRAMS
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix
Bibliography: p. 68
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 68 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
04663/08
(T) - 658.404 Sut A
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Aspek-aspek manajemen usaha
Studi literatur tentang penerapan metode T.R.I.Z. di bidang teknik sipil
Faktor sukses kritis dalam project briefing (studi kasus pada proyek pasar pemerintah kotamadya Surabaya)
Sistem perencanaan dan penjadwalan linear untuk proyek bangunan industri pergudangan
CPM in construction management
Aplikasi dan pengembangan sistem pengendalian biaya proyek untuk kontraktor (studi kasus pada suatu proyek rumah tinggal di Surabaya)
Faktor-faktor kesuksesan proyek berdasarkan pendapat manajer proyek
Evaluasi faktor penyebab, kuantitas, akibat dan tindakan dari sisa material pada proyek rumah tinggal