Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisis jadwal pelaksanaan pekerjaan struktur proyek 6 lantai dengan menggunakan program microsoft project 2003
Author
Sutanto, Agus Salim
Additional Author(s)
Ongkowijoyo, Hariono
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2008
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21011613/SIP/2008
Subject(s)
INDUSTRIAL PROJECT MANAGEMENT-COMPUTER PROGRAMS
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix
Bibliography: p. 68
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 68 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
04663/08
(T) - 658.404 Sut A
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
CPM in construction management
Penentuan produktivitas tenaga kerja pada proyek gudang struktur baja berdasarkan durasi pert (project evaluation review technique)
Penerapan resource allocation dan levelling tenaga kerja dengan menggunakan microsoft project 2010 pada suatu proyek konstruksi
Studi joint risk management pada proyek konstruksi di Surabaya
Construction scheduling
Studi kasus perbandingan berbagai bata ringan dari segi material, biaya, dan produktivitas
Faktor-faktor risiko penyebab sengketa dan kejelasan pembagian tangung jawabnya
Perbandingan resource leveling dengan menggunakan aplikasi program microsoft project 2010 dan primavera