Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisis jadwal pelaksanaan pekerjaan struktur proyek 6 lantai dengan menggunakan program microsoft project 2003
Author
Sutanto, Agus Salim
Additional Author(s)
Ongkowijoyo, Hariono
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2008
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21011613/SIP/2008
Subject(s)
INDUSTRIAL PROJECT MANAGEMENT-COMPUTER PROGRAMS
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix
Bibliography: p. 68
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 68 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
04663/08
(T) - 658.404 Sut A
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Perbandingan dan penerapan paket program komputer untuk manajemen proyek konstruksi
Penerapan program dinamis probabilistik pada manajemen proyek konstruksi
Studi mengenai dampak lingkungan selama tahap pelaksanaan konstruksi gedung bertingkat
Studi tentang inovasi teknologi alat berat dalam industri konstruksi
Program optimasi jumlah backhoe- dump truck dalam operasi penggalian tanah mekanis
Analisa sensitifitas penetapan harga proyek "X" dengan model fair and reasonable markup (FARM)
Analisa pengaruh elemen lansekap terhadap nilai properti berdasarkan persepsi penghuni di kawasan perumahan Surabaya Timur dan Surabaya Barat
Perancangan sistem informasi manajemen sumber daya manusia perusahaan kontraktor (studi kasus di P.T. "X")