Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa penyebab, proses administrasi pengaruh change order pada proyek infrastruktur dan bangunan gedung di Ambon
Author
Sapulette, Willem
Additional Author(s)
-
Publisher
Surabaya: Program Pascasarjana Teknik Sipil Magister Teknik UK Petra , 2008
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01000120/MTS/2008
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix: p. 61 - 100
Bibliography: p. 60
Abstract
-
Physical Dimension
Number of Page(s)
xii, 100 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
04593/08
(T2) - 690.068 Sap A
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Analisa penggembangan produk properti berdasarkan aspek non finansial dan aspek finansial
Faktor-faktor yang mempengaruhi kinerja (performance) sumber daya manusia di tingkat menengah (mid level) manajemen pada perusahaan jasa konstruksi di Surabaya
Kajian metode takt time pada proyek konstruksi
Analisa studi perbandingan antara rumah toko dengan kombinasi rumah toko-stand ditinjau dari aspek pemasaran dan finansial pada proyek gateway, Sidoarjo
Model pengukuran tingkat motivasi dan demotivasi staf teknik perusahaan konsultan di Surabaya
Model pengaruh iklim keselamatan terhadap perilaku keselamatan dengan determinan pengetahuan dan motivasi pada proyek konstruksi
Legalitas redesign dan shop drawing oleh kontraktor
Produktivitas pekerjaan beton bertulang untuk perhitungan harga satuan upah pekerjaan