Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa keterlambatan pada proyek bangunan gedung bertingkat di Surabaya dengan metode window delay analysis
Author
Cahyadi, Antony Kristanto
Additional Author(s)
Biantoro, Rick
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2017
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012181/SIP/2017
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
Appendix: p. 47-62
. Bibliography: p. 46 .
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 62 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02793/17
(T) SIP 2181
Library - 8th Floor
Available
Similar Collection
by author or subject
Analisa teori value chain terhadap kompetensi pada perusahaan kontraktor kelas a di Surabaya
Identifikasi faktor-faktor yang mempengaruhi "time performance" dari kontraktor proyek ruko di Surabaya
Project management
Faktor demotivasi staf profesional pada perusahaan kontraktor di Surabaya
Modifikasi teknik discrete shear GAP pada elemen balok timoshenko berbasis kriging dan pembentukan elemen makro segitiga pelat reissner-mindlin
Joint ventures for architects and engineers
Faktor-faktor manusia yang mempengaruhi penolakan SDM dalam menjalankan sistem informasi berbasis teknologi informasi (studi pada SDM perusahaan konstruksi di Surabaya)
Survei awal kesiapan kontraktor di Surabaya dalam menerapkan "Time Impact Analysis"