Analisa keterlambatan pada proyek bangunan gedung bertingkat di Surabaya dengan metode window delay analysis
Author
Cahyadi, Antony Kristanto
Additional Author(s)
Biantoro, Rick
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2017
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012181/SIP/2017
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
Appendix: p. 47-62
. Bibliography: p. 46 .
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 62 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02793/17
(T) SIP 2181
Library - 8th Floor
Available
Similar Collection
by author or subject
Perbandingan produktivitas pekerja konstruksi berdasarkan perbedaan waktu (pagi hari & siang hari)
Pengukuran tingkat motivasi dan demotivasi pekerja konstruksi pada suatu proyek di Surabaya
Project management in construction
Analisis nilai produktivitas dan labor utilization rate tenaga kerja dengan metode work sampling
Monitoring dan analisis jadwal proyek menggunakan metode performance intensity dan CPM pada proyek hotel
Marine works with cost estimation for ashkelon desalination project
Studi literatur tentang penerapan metode T.R.I.Z. di bidang teknik sipil
Perbandingan komposisi pekerja pasangan dinding bata antara SNI 2008 dengan kenyataan di lapangan...