Analisa keterlambatan pada proyek bangunan gedung bertingkat di Surabaya dengan metode window delay analysis
Author
Cahyadi, Antony Kristanto
Additional Author(s)
Biantoro, Rick
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2017
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012181/SIP/2017
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
Appendix: p. 47-62
. Bibliography: p. 46 .
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 62 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02793/17
(T) SIP 2181
Library - 8th Floor
Available
Similar Collection
by author or subject
Prefabrication dan modular construction serta pengaruh precast terhadap scheduling proyek
Perkreditan kontraktor kualifikasi kecil
Produktivitas tower crane pada apartemen
Project management
The Project management office toolkit
Studi kasus penerapan metode pert pada proyek gudang
Survei awal kesiapan kontraktor di Surabaya dalam menerapkan "Time Impact Analysis"
Perbandingan penjadwalan proyek menggunakan kurva "S" dan CPM network pada proyek "X" di Surabaya