Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa keterlambatan pada proyek bangunan gedung bertingkat di Surabaya dengan metode window delay analysis
Author
Cahyadi, Antony Kristanto
Additional Author(s)
Biantoro, Rick
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2017
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012181/SIP/2017
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
Appendix: p. 47-62
. Bibliography: p. 46 .
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 62 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02793/17
(T) SIP 2181
Library - 8th Floor
Available
Similar Collection
by author or subject
Studi tentang upah dan upah lembur tenaga kerja pada proyek konstruksi bangunan bertingkat tinggi
Perancangan sistem informasi manajemen proses tender pada proyek konstruksi (studi kasus di PT."X")
Studi faktor-faktor penyebab change order pada proyek konstruksi di Surabaya yang menggunakan kontrak traditional serta design-build
Pengaruh komitmen top manajemen terhadap kinerja proyek melalui kemampuan tim proyek dan desain proyek
Studi tentang inovasi teknologi alat berat dalam industri konstruksi
Studi tentang penggunaan jasa asuransi pada proyek konstruksi di Surabaya
Fast build
Penjadwalan proyek pembuatan tabung pemindah panas di CV Alpha Omega Pandaan