Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perbandingan penjadwalan proyek menggunakan kurva "S" dan CPM network pada proyek "X" di Surabaya
Author
Sulistio, Wenly
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Magister Teknik Sipil Universitas Kristen Petra, 2016
Language
Indonesian
ISBN
-
Series
Tesis No. 01000219/MTS/2016
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
Appendix: p. 54-244
. Bibliography: p. 53.
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 244 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02620/16
(T2) MTS 0219
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Identifikasi elemen-elemen penghambat dalam penerapan ISO 9002 pada perusahaan konstruksi serta upaya penanggulangannya
Building management by professionals
Faktor-faktor lapangan spesifik dan global yang menyebabkan keterlambatan pada tahapan pekerjaan struktur dan arsitek pada proyek berskala besar
Model bobot aktivitas sebagai dasar pendistribusian float
Hubungan antara motivasi dan kinerja para mandor dalam pekerjaan konstruksi di surabaya
Sistem penjadwalan LSM untuk proyek instalasi pipa bawah tanah (studi kasus: fuel supply system, proyek pengembangan Bandara Juanda Surabaya)
Perkembangan real estat citraraya di surabaya
Studi kasus pengaruh change order terhadap keterlambatan proyek pada proyek X